Laserfiche WebLink
i~ <br />' C-PIT HYDROGEOLOGIC INVESTIGATIONS <br />' TECHNICAL REVISION N0. 8 <br />MINING PERMIT M-1977-208 <br />6. LIMITATIONS <br />Report Limitations <br />This document was prepared solely for CEMEX in accordance with professional standards at the time the <br />services were performed and in accordance with the contract between CEMEX and Brown and Caldwell <br />dated September 29, 2005. This document is governed by the specific scope of work authorized by CEMEX <br />as Project Order No. 6; it is not intended to be relied upon by any other party except fox regulatory <br />authorities contemplated by the scope of work. We have relied on information ox instructions provided by <br />CEMEX and other parties and, unless otherwise expressly indicated, have made no independent investigation <br />as to the validity, completeness, or accuracy of such information. <br />II <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />a, <br />i Use of contains on This sheet is suhject to the limitations speaLetl at the end of this document. <br />\\BCDEN02\prolecls\Data1GENlCemex\TR-81ReportinglCEMEX Report 0831-07.doc <br />