My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21857
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21857
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:47 PM
Creation date
11/21/2007 10:03:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Enforcement
Doc Date
10/21/2002
Doc Name
Signed Settlement Agreement
From
Blue Mountain Energy Inc
To
DMG
Violation No.
CV2002016
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ C~ <br />tiY:: c <br />g <br />~.~. ~: COLORADO DIVISION OF MINERALS AND GEOLOGY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />SETTLEMENT AGREEMENT <br />NOV/CO NO.: CV-2002-016 ~~T 2 ~ <br />Division of Minerals and Geolepy <br />MINE: Deserado Mine <br />PERMIT NO.: C-1981-018 <br />OPERATOR/PERMITTEE: <br />DATE ISSUED: July 11, 2002 <br />TYPE OF MINE: Underground/Federal <br />COUNTY: Rio Blanco <br />Blue Mountain Energy, Inc <br />ATTENTION: Scott Wandstedt <br />ADDRESS: 3607 County Road 65 <br />_ _ _ Rangely, CO 81648 <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on September 24, 2002, the Division and the operator <br />hereby agree as follows: <br />The amount of the penalty shall be $500,00; <br />2. The penalty shall be paid to the Division by the opemtor not later than 30 days from <br />the date this Agreement is signed by all parties; <br />Payment of such penalty by the operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days afrer the closing date of such <br />conference, which date is se[ forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: ./~~~~s.2C~~ DATE: /n - /!o - a 00 oZ <br />By S~~r ~cJa.Hst~f <br />DNISION OF MINERALS AND GEOLOGY: <br />By ~ <br />o renc fficer <br />By i~%"''"~ <br />Division Director <br />leece;ve~ io-/5-02 <br />DATE: iv -i - <br />Penalty Adjustment Reviewed <br />[Rule 5.04.3(4)(c)] <br />CRS 34-33-123(8)(c) and (d) <br />C-NV81 CI9810ie 1RS_20pL1926 d012 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.