My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09391
DRMS
>
Back File Migration
>
Revision
>
REV09391
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:54 AM
Creation date
11/21/2007 10:03:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
2/6/2004
Doc Name
Postponing The Inspection
From
DMG
To
Mountain Coal Company
Type & Sequence
SL3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />7313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303} 832106 <br />February 6, 2004 <br />Henry Barbe <br />Arch Coal Company <br />c/o Mountain Coal Company <br />P.O. Box 591 <br />Somerset, CO 81434 <br />RE: Beaz No. 3 Mine, Permit No. C-1981-033, Bear Coal Company <br />Phase One Bond Release Application No. 3, (SL-3) <br />Deaz Mr. Bazbe: <br />COLORADO <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAM ATION•MINING <br />SAFETY•SCIENCE <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronafd W. Cottony <br />Division Director <br />Natural Resou¢e Trustee <br />Beaz Coal Company has applied for a Phase One bond release at the Bear No. 3 Mine. Arch Coal <br />Company is one of the surface owners of the disturbed azea that has been proposed for Phase One <br />release. Due to the significant snow cover at the Beaz No. 3 Mine reclaimed area, the Division is <br />postponing the Phase One bond release field inspection until late spring or eazly summer of 2004. Rule <br />3.03.2(2) requires that a bond release field inspection be performed only when the reclamation work <br />can be properly evaluated by the Division. The Rule further states that there may be seasonal <br />limitations on the timing of the field inspection. This postponement is necessary because the snow <br />cover will prevent a proper evaluation of the reclamation results. When the exact date of the bond <br />release field inspection has been set, you will be notified. <br />If you have questions or need additional information, please contact me. <br />Sincerely, <br />D <br />osep J.I~dash <br />Environmental Protection Specialist <br />cc: Daniel Beaz {Beaz Coal Company) <br />William Bear (Bowie Resources) <br />Cazl Johnston (Office of Stuface Mining) <br />c:/word/beaz3/sl3postponelet2 <br />Office of Office of Colorado <br />Mined Land RedamaCron Active and Inactive Mines Geological Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.