My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21836
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:46 PM
Creation date
11/21/2007 10:03:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Enforcement
Doc Date
5/26/1993
Doc Name
REQUEST FOR EXTENSION OF ABATEMENT PERIOD
From
ACZ INC
To
MLR
Violation No.
CV1993052
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III Illllllllllllllll <br />ACZ ACZ Inc. 999 <br />Engineering and Environmental Services <br />1475 Pine Grove Road, Suite 109 <br />P.O. Box 774016 <br />Steamboat Springs, Colorado 60477 <br />303-879-6260 <br />May 19, 1993 <br />Mr. Joseph J. Dudash <br />Office of Mined Land Reclamation <br />1313 Sherman Street -Room 215 <br />Denver, Colorado 80203 <br />Re: Energy Fuels Mining Company <br />Extension of Abatement Period <br />Dear Mr. Dudash: <br />A~~F/~~ <br />~", ~Ay261993 <br />~Srp~~ 01`^,1~~~~, a/S <br />O ~ t'~Oip9y <br />Raton Creek Mine, NOV C-93-52 Request for <br />With this letter Energy Fuels Mining Company (EFMC) respectfully requests extension of the <br />date for abatement of NOV C-93-52. <br />Required Remedial Action: 1) Install approved section of diversion, and 2) Reconstruct <br />portion of diversion to drain into permanent watershed diversion, or 3) Submit a <br />technical revision to redesign diversions around substation area to reflex existing site <br />conditions and provide a revised Map 12 to show southern diversion location and <br />sections relative to approved designs, as done for northern diversions. <br />Current Abatement Status: Based on field reconnaissance and initial field location of <br />ditch segments, EFMC has completed preliminary ditch designs and modified Map 12 to <br />reflex the proposed drainage configuration in the substation area. The revised Map 12 <br />was submitted for OMLR review and comment with an initial abatement submittal on <br />May 12, 1993. Based on preliminary concurrence with the proposed drainage design, <br />EFMC will complete and submit final design revisions. <br />The required abatement date for submittal of revised designs is May 19, 1993. Given the need <br />for OMLR concurrence with proposed drainage design modifications prior to completion and <br />submittal of final designs, EFMC is requesting extension of the abatement date for NOV C-93-52 <br />to May 26, 1993. Abatement will involve submittal of final revised drainage designs, associated <br />technical revision application components, and following OMLR approval, field modifications <br />to implement the revised designs. <br />Thank you for your cooperation. Please feel free to contact me if you have any questions. <br />Sincerely, <br />ACZ Inc. <br />/ ~i~%~- <br />cc: A. Weaver/EFMC Southfield <br />R. Acre/EFMC Southfield <br />
The URL can be used to link to this page
Your browser does not support the video tag.