Laserfiche WebLink
CIRCES Cost Est imating Software <br /> <br />PROJECT IDENTIFICATION BULLDOZ ER WORK <br />Task q 001 Slatu Culcrado Permitljob# :M-2000-016 <br />Dale : 1 t/ 10/2005 County :Weld Abbreviation :no ne <br />User: ESC Site RiverbendPd Fdenama:M01b-U01 <br />Agency or organization name DA?G <br />Permit a other job aUwn : AMU I <br />Tasx description : Back1i11 & Grade Plant Site Disturbance <br /> <br /> <br />HOURLY EQUIPMENT COST <br /> Bask: machine :Cat D7UR • IUSU Horsepower : 570 <br /> Blade typo :Senn-Unrversel <br /> Attachment no. t : BOPS Cab Shin basis : 1 per doy <br /> Attachment no. 2 •. /-shank upper <br /> Oeta source (CRG) <br /> Utitizallon <br />Cost Breakdown ; Ownership CostlhOUr : $79.58 NA <br /> Operating cosuhour-. 5139.87 1U0 <br /> Rlppor op. cosuhour 50.00 0 <br /> Operator cosutwur : $32.53 NA <br /> Total unit cosohour : 5257.98 Total Ileot CASUhour 5503.96 <br />MATER <br />L <br />U <br />NT <br />T <br />E <br />IA <br />Q <br />A <br />I <br />I <br />S <br />Initial Swell Loose <br />volume `00.000 LCY lector: NA volume: 500,000 LCY <br />Source of estimated volume :DMG Estinrete <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION J i <br />i <br />ti <br />F <br />C <br />C <br />t S <br /> ond <br />orrec <br />ors <br />ob <br />t <br />on <br />on <br />ac <br />Operator skill : <br />0 75 ource <br />(evg ) <br />AverayC push d~sfance i50 leel Material consistency : t 00 (Cat HB) <br />Unadjusted hourly productan : 1,243 2 LCY/hr Dozing method 1.00 lgen.) <br /> Vr5ibillly _. 700 (avg.) <br />Material consistency descripton : Job eBic~ency 0.83 (IshAUdey) <br />Consolidated stockpile Spoil pile : 0.80 (!nd-Aj <br /> Push gradient: 1.1~ (Cut HB) <br />Average push gradient 0 00 % (pos) Altitude . 1.00 (Cet HB) <br />Average site aldtudo : 4,920 feel Material weight : 0.79 (Cef HB) <br /> Blade type 1.00 (S'SUrV) <br />Material weight : 2,900 Ibs1LCY Not correction 0 39 <br />Weight descnption <br />Decarnposed rock - 50'u Rock. 50% Earth Adjusted unit produUlon •I%i) +3~ LCYlhr <br /> Adlustad }loot production 981.69 LCV,'hr <br />JOB TIME AND COST <br />fleet size : 2 Dozer(sj Total lob lime 509.33 Hours <br />Und cost : 50.513 /LCV Total job cost 5256,679 <br /> <br />