My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-11-17_REVISION - M2000016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2005-11-17_REVISION - M2000016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:43:09 PM
Creation date
11/21/2007 10:02:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Revision
Doc Date
11/17/2005
Doc Name
Bond Calculation
From
DMG
To
File
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheaf 2 of 2 <br />Haullno Capacity <br />Suaper Payoad (weight) Basis Sereper Bowl (volume) Basis <br />Matonal weight : 2,100 poundslLCY Struck volume : )4.00 LCY <br />Matenal descnphon Heaped volume : 20.00_ LCY <br />Earth -loam Average volume : 17.00 LCY <br />Rated payload : 48,000 pounds Adjusted capacity : 17.00 LCY "' <br />Payload capacdy : 22 86 LCY ••• rwrnty pnltlucfk •r repade m:umo oar v/upn~ {rmr ;rr ;xiN -uun rngtlela <br />4vcla Tlme : Job Condition Corrections : Site altitude (h) 4,920 <br />Scraper Push dozor Source <br />------ -- <br />Scraper bading limo' U.50 minutes Altitude adj. 1.000 f 000 (Cot HBJ <br />Maneuver and sproad time : 0.60 minutes Job efficiency 0.830 _ 0.830 (Cef HB) <br />' ip„e time per e~rapm pair on push pun rnupais Nnl correction 0.830 0.830 <br />Travel lima <br />Road condition description :Rutted dirt, 11ffle mainfenence, no wafer. 2' fire penetreflon <br />Haul Route : <br />Sog. 11 Haul distanco (feeq Grade (°k) i Roll. roe (%) Total res. (%) Vebciry (fpm) Travel Gme (min )° <br />1 1,000 000 5.00 5.00 2218 0.60 <br />. _ -- <br />Haul limo ; 0.60 minutes <br />Rotum route <br />1 1,f~0 0. tM 5.00 5.00 2814 0, 50 <br />- -- <br />-~ <br />vavW taro hn aerh sepmeM rs aEMrWOd b apcetsraeoNdmeaeroGOn ROtum lime ; 0. SO minutes <br />Lade vebtiges are nwe aMinatlie per hNOI resistam•» shpwn, rot xvnrapp <br />Total scraper team cycle lima goad + haul + maneuver and sproad ~ velum) : 2.20 minutes <br />Unadjusted unit produclionlhour 463 51 LCYmour "' Adfusted for Joh oondulons 384 ? t LCYihour <br />Optimal number of scrapers por push dozer 2 Selectod numbor of scrapers : 2 scraper(s) <br />Adfusled single scrapor team (urnq hourly production 769 43 LCYPoOUr <br />Adjusted multiple scraper team (Oast) howdy production 769.43 LCYihour <br />J08 TIME AND COST <br />Flool size 1 Team(s) Total job lime . 59.78 Hours <br />Unit cost : 50.753 ILCY Total fob wst ;34,628 <br />
The URL can be used to link to this page
Your browser does not support the video tag.