My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09375
DRMS
>
Back File Migration
>
Revision
>
REV09375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:53 AM
Creation date
11/21/2007 10:02:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987027
IBM Index Class Name
Revision
Doc Date
1/8/2001
Doc Name
TR SUBMITTAL HARDSHIP LODE
From
DMG
To
COLO QUARRIES INC
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br /> <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Date : 08-Jan-2001 Permit or job no.: M-7987-027 <br />User: JD1 Abbreviation: none <br />Filename : M027-000 <br />Agency or organization name :OMG <br />Permit or job action :Final Reclamation <br />TASK LIST [DIRECT COSH <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Rip Pit Floor _ _ ~ _npper ~ 1 fO.Oq $1,246 <br />002 -Replace Topsoil ~ scraped ~ ~ 13~C0 31,855 <br />003 -Grade Topsoil ~ dozer 1 ~ 2.Oq $227 <br />004 ~ -Reseed Permit Area ~ revege 1 40.00 1 $5,557 <br />005 ~ -Mob/demob Equipment mobilize 1 5.00, 31,200 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> _ ~ _~ _ ~ __ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTAL51 7Q,Qq $10,085 <br />includes inllalion factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />Site :Hardship Lode <br />State :Colorado <br />County :Custer <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />1.55 <br />1.05 <br />35.00 <br />10.00 <br />TOTAL DIRECT COST' ~ $10,085 <br />°6 0l direct total = $156 <br />°b of direct total = $106 <br />hrs'...$/hr: $33.50 total = $1,172 <br />°6 o/direct total = $1.008 <br />'assume net hours = 50^; of lash hours TOTAL O 8 P = $2,443 <br /> CONTRACT AMOUNT (direct . O 8 P) _ $12.528 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contract/bid preparation : 4.25 °o of corr. NA total = $532 <br />Reclamation management and/or administration : 5.00 °6 o(cntr. NA total = $626 <br />CONTINGENCY - NA- NA [Olaf = NA <br />'contingencies attounted for ar task level TOTAL INDIRECT COST = $3,602 <br /> TOTAL BOND AMOUNT {direct + indirect) _ $73,687 <br /> <br /> ~h j3r~d0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.