Laserfiche WebLink
<br />9. Page IV-22 has been revised to describe more completely the sequence of operations <br />associated with the merger of the piles, and to better chazacterize the installation of the <br />operational drainage control plan. <br />10. There is now a note neaz the title block which cross references the Map 150 and the post- <br />mine topography to Map 77. Map 77 is now being certified. <br />11. Map 77 now includes a figure showing the general configuration and specifications of a rock <br />filter for use with the soil berms. Page N-22 has been changed to reflect the use of earthen <br />berms on the topsoil piles. <br />~jC' <br />~ Lr ~G~r~tz}2 ~ <br />fv~t~r <br />ia~~ J <br />