My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09333
DRMS
>
Back File Migration
>
Revision
>
REV09333
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:50 AM
Creation date
11/21/2007 10:02:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992017
IBM Index Class Name
Revision
Doc Date
6/8/1998
Doc Name
TRANSMITTAL LETTER 112 CONVERSION APPLICATION FOR CONSTRUCTION MATERIALS M-92-017
From
EARTH STONE LTD
To
DMG
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />112 Conversion Tentative Schedule <br />5/26 Complete Application sign and initial application and notarize <br />5/26 Post NOTICE sign at site entrance <br />5/26 Place copy with clerk and recorder <br />5/26 Mail notices to Delta County Commissioners and SCS, return receipt requested <br />Wait for return receipt of mailings estimate return by 6/2 <br />6/2 FED EXP application to MLRB with application fee $1,875.00 (confirm receipt and filing <br />status; starts 90 to ] 20 day clock for review and approval by DMG). Must wait until <br />DMG indicates that the application is complete, this initial review normally take 1 week. <br />6/9 Publish 4 timesonce a week for 4 consecutive weeks in local newspaper (must be done <br />within 10 days of filing with DMG), and obtain affidavit of publication. Mail a copy to <br />DMG after 1st publication. <br />6/12 Send mailings return receipt requested to adjacent property owners. <br />During this period obtain damage agreements from owners of structures within 200 ft of <br />the proposed disturbance, 6/12 to 8/25. This will include adjacent fences, ditches and <br />possibly roads depending on our DMG reviewers perspective. <br />List adjacent land owners here <br />Wait for return recent of mailings, estimate receipts in 2 weeks say by 6/26. Just a note <br />the post office can take rrp to -JS days to get anon-deliverable notice back to us. <br />6/26 Send receipt slips to DMG. <br />Noticing for the application is complete. <br />Put bonding together during this window and have it ready to submit upon approval. If <br />this application is combined with a Succession of Operators to Montrose County, only a <br />Performance Warranty will be required, no Financial Warranty is necessary. <br />9/24 DMG approval if 90 day review and all goes well if an extension is requested by DMG <br />this could be extended to about 10/24 submit bonding at this time <br />Wait for DMG to approve bonding and issue permit letter normal turn around 1 week <br />10/1 112 Permit Issued <br />BLA1 /West End M-92-0I7 - SCHEDULE.0.'PD <br />