Laserfiche WebLink
<br />Page 3 <br />B) Complete said application within 30 days if the application is a 1 10 permit amendment, within 90 days f <br />it is a ] 12 permit conversion without objections, and within 120 days if it is a 112 permit conversion <br />which receives objections; and <br />(C) Require the operator to post adequate financial warranty to issue a permit within thirty (30) days after <br />approval of the application; and <br />(D) Require the operator and/or landowner to post an interim reclamation bond in the amount of $2,000.00 <br />by November 20, 2000; and <br />(E) Pay a penalty of $9,300.00, except that all but $500.00 of this penalty shall be suspended if Respondent <br />complies with this order. <br />(F) Cease and Desist from any activities outside the present permit boundary until such time as the operator <br />amends the reclamation permit for the extended site disturbance. <br />Nunc pro tunc November 1, 2000. <br />DATED this`a.~~~ day of February 2001. <br />FOR THE COLORADO MINED LAND RECLAMATION BOARD <br />Michael B. Lo , <br />Division of Minerals and Geology <br />oss~ahd\board orders\oa00\nmsonville revised order? ? I-01 <br />