Laserfiche WebLink
Interoffice memorandum <br />Walker to Brown <br />29 June 1999 <br />Page 6 of 6 Pages <br />ITEM REFERENCE PURPOSE COMPLIANCE? <br />and construction usually do not appeaz <br />specifications for SF on an as-built. <br />Operation and 2.05.3(4)(ii)(C) Operation and Not described but inferred <br />maintenance maintenance is usually by the design. <br />requirements described by text, <br /> which may or may not <br /> appeaz on an as-built. <br />Safety factor of 1.3 2.05.6(11)(k) The stability analysis <br /> concludes a factor of safety <br /> of 1.305. <br />Stage-storage curve 4.05.6(3)(a) Demonstrates the Provided in the SEDCAD <br /> storage volume of the demonstration. <br /> pond at water levels <br /> (the capability to <br /> accommodate design <br /> runoff). <br />Maximum level of 4.05.6(3)(b) This is a design Provided in the SEDCAD <br />sediment storage feature that demonstration as 7373.16. <br /> demonstrates that the <br /> pond has the <br /> capability to store <br /> sediment and still <br /> meet other <br /> requirements. <br />Other features, such as N/A to this design. <br />filter blankets, drain <br />blankets, etc. <br />Other features, such as None according to this <br />walkways, ladders, design. <br />baffles, etc. <br />Other: Elevation 4.05.6(12) 20' threshold. Estimated at 12 feet. <br />difference of the <br />upstream toe-of--slope <br />and invert of the <br />emergency spillway <br />