My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-01-04_REVISION - M1986076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986076
>
2004-01-04_REVISION - M1986076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:23 PM
Creation date
11/21/2007 10:01:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986076
IBM Index Class Name
Revision
Doc Date
1/4/2004
Doc Name
Cost Summary Form
From
DMG
To
DGMC
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />Task # : 07a State :Colorado Permit/job # : M-1986-076 <br />Date : 01/05/2004 County : La Plata Abbreviation :none <br />User : RCO Site :Incas Mine Filename : M076-07a <br />Agency or organization name : DMG <br />Permit or other job action :Amendment AM-03 <br />Task description :Glade and leCOntOUl IIOII-pe~fl7alleflt I'OadS, first phase <br />HOURLY EQUIPMENT COST <br />Mach ine description : Ca1318B L Horsepower : 115 <br /> Weight (MT) : 18.36 <br />Cost Breakdown : Utilization <br />Ownership cost/hour : $20.23 NA Shift basis : 1 per day <br />Operating cosUhour : $20.04 100 Data source : (CRG) <br />Operator cosUhour : $30.84 NA <br />Total unit cost/hour : $71.11 Total fleet cosUhour : $71.11 <br />MATERIAL OUANTfTIES <br />Initial Swell Loose <br />volume : 446 LCV factor : NA volume : 446 LCY <br />Source of estimated volume :700 LF road (to former mill loc.) x 0.51 cy/I/ <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swinc loaded, dump bucket, swing empty) <br /> Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br /> Cycle time value : 0.26 minutes <br />Bucket Caoacitv <br />Rated bucket capacity : 0.92 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.68 Rock -Well blasted (60% - 75%) <br />Adjusted bucket capacity : 0.62 LCY <br />Job Condition Correction Factors <br />Site altitude : 10,800 feet <br />Source <br />Altitude adjustment : 0.83 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shili/day) <br />Net job correction : 0.69 multiplier <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Unit cost : $0.709 per LCY <br />145.55 LCY/hour <br />100.27 LCY/hour <br />100.27 LCY/hour <br />Total job time : 4.45 hours <br />Total job cost : $316 <br />
The URL can be used to link to this page
Your browser does not support the video tag.