Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name: DMG <br />Taskk: 13a Stata:COloredo Pemvtfjob B: M-1986-076 <br />Date: 01/062004 County: La Plate Abbreviation none <br />User: RCO Site :Incas Mine Filename: MOl6-13a <br />Permit or other lob action :Amerxlmenf Am-03 <br />Task desorption :118D1 lBglBmatlOD BQtllpmBnt f0 antl /lOm S11B <br />EQUIPMENT TRANSPORT RIG COST Shitl basis: 1 per tlay <br /> Cost tlata spume : CRG Date <br />Track trector description :Generic on-highway truck trecroa 6xd, diesel powered, d00 HP <br />Track trailer tlescdption :Generic Polding gooseneck, drop deck equipment trailer ( 25T, SOT, and 100T) <br />Available rig capacities: 0.25 Tons 2E50 Tons 51+TOns <br />Cost Breaktlovm: Ownership cosvnour: $24.34 $26.99 $33.09 <br />Operating cosMaur: $28.49 $30.27 $34.34 <br />Operator cost/nour. $27.07 52707 $2201 <br />Helper cost/nour. $0.00 $23.78 $23J8 <br />Total Unit CosUhour. $79.90 $108.11 $118.28 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description WeighUUnit <br />(Tons) Ownership <br />CosMrNnii Haul Rlg <br />CosLhr/unit Fleet Size <br />(NO. units) Haul Trip <br />Cost/nrdleet Ratum Trip <br />CosVhrHleat DOT gamut <br />Costttleet <br />-Cat 3/8BL 20.24 $19.37 $79.90 1 $99.27 $79.90 $000 <br />-CAT 938G 14.45 $13.86 $79.90 2 $187.51 $159.80 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 5286.78 5139.70 $0.00 <br />ROADABLE EQUIPMENT <br />Machine <br />Description Total <br />Cosvhour/unit Fleet Size <br />(NO. units) Haul Trip <br />CasMrtlleet Retum Tnp <br />CwMrtlleet <br />-Flatbed Truck, 4x2. 15KGVW .896.39 / 59639 $36.39 <br />Oafbed br heulinB reveg <br />materials and derox pumping <br />equipment, end to remove <br />debris and contaminants. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : 536.39 536.39 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Durango Aree <br />Trensoodation Cvde Tme: Nan- Total one-way travel tlistance: 20.0 miles <br /> Roatlable Roatlabla Average travel speed: 250 mph <br /> Equipment Equipment <br />Haul time (hours)= 0.80 0.80 Total non-matlable moGdemob cost -: $1,415.94 <br />Retum time (hours)= 0.80 OBO •r..o room rape wrh MW dg <br />Loatling time (hours)= 0.50 NA Total roatlable rtab/tlanab rost -': 55822 <br />Unloatling time (hours)= 0.50 NA "ore mum rap,mMUl na <br />Subtotals= 2.60 1.60 <br />JOB TIME AND COST Total lob time: 5.20 hours <br /> Total rob roar : x1,474 <br />