Laserfiche WebLink
- ~- <br /> <br />PLANS FOR ABATEMENT OF VIOLATION 1283-20 <br />1) <br />fication and upgrading of sedimentation ponds to <br />ral requirements will be met. <br />that draina~ <br /> <br />On March 4, 1983 sedimentation pond B developed severe leaks, which <br />caused the water contained in that pond to drain into the active pit. 450,000 <br />gallons of water were pumped from the pit into Mann Draw as a result of this <br />structural failure of pond B. Ponds A and C were functioning properly, but <br />were, due to the unusual amount of precipitation, near capacity at the time <br />of discharge. <br />Pond B has been repaired and thus, should be able to contain the runoff <br />it was designed to handle (i.e. 1.7 acre-feet, 553,945 gallons). Repairs to the <br />pond included removal of stored sediment and lining of the pond bottom with <br />an impermeable clay material. All repairs were complete by June 17, 1983. <br />Repairs to ponds A and C are not necessary ~~ince both ponds function <br />properly. Enlargement of the sediment control sysl:em is not required because, <br />with pond B repaired, the present system is adequate to meet the drainage <br />control requirements at the mine site. <br />2) Containment of pit water on the 4ourg property. <br />The Bourg mine sedimentation system is adequate to contain water <br />which discharges into the pit. Water which accumulates in the pit will <br />be pumped into an approved sediment pond or will be used on roads within <br />' the property boundry for dust suppression. <br />.~ <br /> <br /> <br />i <br />