Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE NIINING RECLAMATION AND ENFORCEMENT <br />Mine-Site Evaluation Inspection Report <br /> <br />1. Permiuee/Person <br />9. <br />Permit Number I0. Type <br />a. Perrm[ b. RA <br /> MINREC, INC. C-025-81 PP <br />2. Address 11. Inspection Date l2. Inspection Type 13. Joint Inspection <br /> rJa JAMES E. STOVER, 09/15!94 C~ ~Y yi/o <br /> <br />3. City 4. <br />State <br />14. MM - DD - ri <br />Permit Status <br />15. Site Status <br />16. Facility Type <br /> GRAND JUNCTION CO BR PI B~ <br />5. Zip Code 6. Phone Number 17. OSM Office ti 18. RS1 t! 19. Land Cade <br /> 81506 -~ 303-963=3440 020 l57 <br />7. Operator if Different than Permittee 20. M.S.H.A. ID N 2l. State Code 22. County Code <br /> OS-02658 08 097 <br />8. Mine Name 23. AVS Perminee Entity lD Number 23b. State Office <br /> N. THOMPSON CREEK 113502 <br />24. Performance Standard Categories <br />A. Administrative <br />1. 1 Mining within Valid Permit <br />2. 1 Mining within Bonded Area <br />3. 2 Terms & Conditions of Permit <br />4. 1 Liability [nsurancc <br />5. 1 Ownership and Control <br />6. 3 Temporary Cessation <br />B. H yd rologic Balance <br />1. 1 Drainage Control <br />2. 2 Inspections & Certifications <br />3. 1 Siltation Swc[ures <br />4. 1 Discharge Swctures <br />6. 1 Effluent Limits <br />7. 1 Ground Water Monitoring <br />8. l Surface Water Monitoring <br />9. 1 Drainage -- Acid-Toxic Materials <br />10. 2 Impoundments <br />II. 1 Stream Buffer Zones <br />C. T opsoil R Subsoil <br />1. 3 Removal <br />2. 3 Substitute Materials <br />3. 1 Storage and Protection <br />4. 1 Redistribution <br />D. BackfiBing & Grading <br />1. 1 Exposed Openings <br />2. 1 Contemporaneous Reclamation <br />3. 1 <br />- Approximate Original Contour <br />4. 1 1-lighwall Elimination <br />5. 3 Sleep Slopes (includes downslope) <br />6. l Handling of Acid & Toxic Materials <br />7. 1 Stabilization (rills and gullies) <br />E. Excess Spoil Disposal <br />I. 3 Placement <br />2. 3 Drainage Control <br />3. 3 Surface Stabilization <br />4. 3 Inspections & Certifications <br />F. Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1. 1 Drainage Conwl <br />2. 1 Surface Stabilization <br />3. 1 Placement <br />4. 1 Inspections and Certifications <br />5. 1 Impounding Swctures <br />G. Use of Explosives <br />1. 3 Blaster Certificauon <br />2. 3 Distance Prohibitions <br />3. 3 Blast Survey/Schedule <br />4. 3 Warnings & Records <br />5. 3 Control of Adverse Effects <br />H. I Subsidence Control Plan <br />I. Roads <br />1. 3 Road Conswction <br />2. 1 Certification <br />3. 1 Drainage <br />4. 1 Surfacing and Maintenance <br />5. 4 Reclamation <br />J. Signs & Markers <br />1. 1 Signs <br />2. 1 Markers <br />K. 1 Distance Prohibitions <br />L. Revegetation <br />1. 1 Vegetative Cover <br />2. 1 Timing <br />M. 1 Postmining Land Use <br />N. Other <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a Date of Last <br />Sae Complete 07/29/94 <br />Ins <br />eaion <br /> <br />8 <br />0 <br />~ <br /> <br />Permit Review <br />a <br /> <br />127 <br />0 <br />~ <br />a bonded <br />p . . . 385 <br />0 <br />d <br />i <br />P <br />Frequency for previous 4 Calendar Qtrs. b. Phase I . <br />tte <br />a. <br />erm <br />b. Number of Number of <br />requred complete <br />complete ^q mspeaions ~ 16.0 b. Inspection Time 127.0 released <br />b. Distttrbcd <br />74.0 <br />inspeaions coMuaed <br />6'0 <br />l Tu <br />24.5 c. Phase Il <br />released (Estimated) <br />c Number of Number of a Trave <br />ne <br />required ^ partial ^ <br />pamat g inspections g <br />0 <br />9 <br />24 <br />5 <br />d. Phase IB <br />Page 1 of <br />inspeaions mnduaed , d. Report Writing . released ,,,-„m,w„ ,~, <br />