My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09218
DRMS
>
Back File Migration
>
Revision
>
REV09218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:45 AM
Creation date
11/21/2007 10:00:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Name
TRAPPER MINE RESPONSE TO PR-1 ADEQUACY RESPONSE DOCUMENT
Type & Sequence
PR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i s <br />TRAPPER MINE RESPONSE TO PR-1 ADEQUACY RESPONSE DOCUMENT <br />May, 1987 <br />Also, Trapper only appears to have a deficit. In PR-2, upon which your <br />anlysis is based, Trapper has proposed to increase our replacement depth <br />by two inches on rangelands and decrease replacement depth on cropland by <br />two inches. This change accounts for the apparent deficit in topsoil. <br />The Division originally approved a replacement depth on rangeland of ten <br />inches. Thus, if Trapper does end up with approximately two inches less <br />than the twelve inches for rangelands as proposed in PR-2, we are still <br />returning to the original permit approval of ten inches,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.