Laserfiche WebLink
<br />TRAPPER MINE RESPONSE TO PR-1 ADEQUACY RESPONSE DOCUMENT <br />May, 1987 <br />2. Topsoil <br />The revision does not present any specific information with respect to <br />soils in the new pit areas. The operator's basic statement is that <br />everything is the same as in the original permit. This is not adequate. <br />The operator must provide information on stripping depths for each soil <br />unit, total volume stripped, and volumes placed in each proposed stock- <br />pile. These quantities are necessary for a complete review of the plan, <br />and for bonding calculations. <br />Response <br />Tables 1 and 2 (attached) provide the requested information. <br />