My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09193
DRMS
>
Back File Migration
>
Revision
>
REV09193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:43 AM
Creation date
11/21/2007 10:00:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/7/2002
Doc Name
ADEQUACY REVIEW PR-06 UNITE TRAIN LOADOUT AND INCREASE IN PRODUCTION BOWIE 2 MINE PN C-96-083
From
DMG
To
BOWIE RESOURCES LTD
Type & Sequence
PR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Natural Resources <br />1713 Sherman St„ Roam 215 <br />Denver, Colorado 80203 <br />Phone: (3D3) 866-3567 <br />FAX: (303) 832-8106 <br />January 7, 2002 <br />Mr. William A. Bear Jr. <br />Bowie Resources Limited <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />R E C L A M A T I O N <br />MI NING•SAFETY <br />Bill Owens <br />Governor <br />P.O. Box 483 <br />Greg E. Watcher <br />Paonia, Colorado 81428 E><eculrve Director <br />Michael B. Long <br />Divisbn Director <br />RE: Adequacy Review, PR-06, Unit Train Loadout and Increase in Production, Bowie No. 2 <br />Mine, Permit No. C-96-083, Bowie Resources Limited <br />Dear Mc Bear: <br />The Division has finished its review of the revised reclamation bond liability estimate for Bowie <br />Resources Limited's (BRL) submittal, dated December 6, 2001, for Permit Revision No. 6. The <br />revised liability estitate is $6,553,139.00, which is $17,977.00 less than the previous estimate of <br />$6,571,116.00. The main reason for the decrease is that BRL is proposing to salvage less topsoil <br />than in the previous proposed plan; 24,000 cubic yards versus 43,600 cubic yards. Therefore, less <br />topsoil needs to be replaced. <br />Attached are the replacement pages for the reclamation cost estimate for PR-06. Tasks 000, OOg, <br />OOh, OOk, 90d and 105 should replace the corresponding pages in the estimate that had been sent <br />to you previously. Tasks 079 and 107 are new tasks related to the new sediment pond K and <br />should be added to the estimate that was sent to you previously. <br />If you have any questions, please call me. <br />Sincerely, <br />J sep .Dash <br />nvironmental Protection Specialist <br />cc: Jim Stover P.E. (J.E. Stover & Associates) with attachments <br />Sandy Brown (DMG) without attachments <br />Attachments <br />STATE OF COLORADO <br />c:\ms97\bowie2\pr6adeg4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.