My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09171
DRMS
>
Back File Migration
>
Revision
>
REV09171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:42 AM
Creation date
11/21/2007 10:00:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977560
IBM Index Class Name
Revision
Doc Date
4/5/1995
Doc Name
ROCKY FORD EAST PIT FN M-77-560 AMENDMENT AM-001 REVISED BOND FIGURES FOR NEW AMENDMENT AREA &
From
DMG
To
VALCO INC
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DOZER COST 8 PERFORMANCE DATA IARKSHEET <br />Machine Nake L Model: Cat D8N <br />Dozer BLade: Semi-Universal <br />Attachment 1'1: ROPS Ceb <br />Attachment N2: 3-shank ripper <br />Lest Cost Revision: May, 1991 <br />_______________ <br />BASE EWIPNENT COSTS (CRG) <br /> <br />COLORADO DIVISIpI OF MINERALS AND GEOLOGT <br />sheet 1 of 2 sheet <br />REFERENCES: 1) Cost Reference Guide (CRG) <br />2) Contractors Equi Anent Cos[ Guide (CECG) <br />3) Colorado Contractors Association <br />Naga Rete Schedule <br />4) Caterpillar Perfoimence Narxbook <br />~ ------------ Bese Ownership 8 Overhaul Costs -------------~ --------------- Base (yeretitq Costs ----=-- ----- <br /> Ownership ~ Overhaul I Field Repair <br /> Depreciation CFL Overhead ~ Labor Parts Labor Per[s ~ Fu[~l Lube Tires G.E. <br />3 i <br />Machine f20. 16 (7.32 (5.40 (4.22 (9.10 f4.b9 f7.34 f11.42 (2.99 (0.00 ft. <br />Attachment k1 (0.00 f0.00 (0.00 (0.00 (0.00 f0.00 f0.00 f0.00 (0.00 (0.00 S0. <br />Attachment M2 : (2.93 f0.93 (0,58 f0.70 f1.03 51.29 f0.8B f0.00 (0.23 (0.00 f0. <br />COST ADJUSTMENT FACTORS (CECG) <br /> ACCM1If ITION COST BREAKDONN <br />Factor Description <br />---------- <br />-------- Bese Value <br />- Adj. Value Multiplier ~ Cost Elements (CECG) Factcr Adj. Cost <br />------- <br />Acquisition cost: ---------------- <br />5285,880.00 -------------- <br />(230,326.37 ------------ <br />0.806 I <br />~ _________---.----------- <br />Base purchase price ------_- -___-____-__ <br />5285,880.00 <br />Econ. life hrs.-machine: 10,445 10,455 0.999 ~ Less dealer distant 0.100 f28, 588.00 <br />-atteth. f1: 8,800 8,800 1.000 ~ Plus freight 0.020 (5,717.60 <br />-attach. it2: 8,200 8,200 1.000 ~ Plus dealer cherges~ 0.005 (1,429.40 <br />Amual use hours: 2,112 1,525 1.385 ~ •MLRD estimate ----'------- <br />Mechenic~s labor cost: (24.78 (21.95 0.886 ~ Adjusted purchase price (264,439.00 <br />Fuel cost/gal.-gasoline: 51.12 f1.12 1.000 ~ Plus taxes: Sales ~ 3X 57,933.17 <br />-diesel: (0.87 f0.87 1.000 ~ SNN 82X 55,288.78 <br />Luba cost: (2.99 (2.99 1.000 ~ Less tire cost (0.00 <br />Tire life hours: 0 0 1.000 ~ Less salvage value 0.179 (47,334.58 <br />Tire factor: 0 0 1.000 ~ ----'------- <br />Tire cost: <br />_________________________ f0.00 <br />__________________ f0.00 <br />_____________ 1.000 <br />____________ ~ <br />I Net acquisition cost <br />__-------...........--.- <br />-------_ (230,326.37 <br />____-_______ <br />ADJUSTED EDUIPMENT COSTS <br /> <br />_________________________ ---------- Adjusted Ownership 8 <br />________________ ______________ Overhaul Costs -----------~------------- Adjusted Operating Costs ----- <br />________________________________________________________________________ ----- <br />_____ <br />_________________________ <br />Acquisition cost __________________ <br />(18.60 _____________ <br />N/A ____________ <br />N/A ________ <br />N/A ________________________ <br />N/A N/A N/A ________ <br />N/.1 _____________ <br />N/A _______ <br />N/A _____ <br />N <br />Econ.life -Dozer 8 ROPS (18.59 N/A N/A (4.22 (9.09 (4.69 (7.33 N/.1 N/A N/A N <br />-Attach. K2 N/A N/A N/A (0.70 (1.03 51.29 (0.88 N/.l N/A N/A N <br />Amual usage 525.76 (11.43 (8.28 N/A N/A N/A N/A N/.1 N/A N/A N <br />Double shifts 519.32 (5.71 (4.14 N/A N/A N/A N/A N/.1 N/A N/A N <br />Triple Shifts 517.18 53.80 52.76 N/A N/A N/A N/A N/~( N/A N/A N <br />Mech. labor-Dozer 8 ROPS N/A M/A N/A 53.74 N/A f4. 15 N/A N/.l N/A N/A N <br />-Attach. /2 N/A N/A N/A 50.62 N/A 51.14 N/A N/,( N/A N/A N <br />Fuel/lobe -Dozer 8 RODS N/A N/A N/A N/A N/A N/A N/A (11.9.? 52.99 f0.00 f1. <br />-Attach. M2 N/A N/A N/A N/A N/A N/A N/A (0.00 f0.23 50.00 f0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.