Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWRK -STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (f) <br />________I__________________________________________________I____________ <br />n/a <br />Subtotal (H): <br />I. EARTHYORK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />________~_______________________________~--_______-_______I__________ <br />n/a <br />Subtotal (I): <br />J. EARTHNORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />__-_____I_____________________________________________ <br />~ 26 ~ Move overburden from Stage 111 to lake banks <br />~1 22 ~ Replace topsoil in SFege-i~- <br />~if.~G25 Tl-Jz- <br />Cost (f) <br /> <br />Subtotal (J): -1~E-- <br />--~~-r-~T ll/7-59 <br />