Laserfiche WebLink
s 1 <br />y coon <br />Gnav~e <br />~mpany <br /> <br />Corporate Office: <br />3609 South Wadsworth Boulevard, Suile 300 • Lakewood, Colorado 8D235 <br />F O. Box 5485 • Denver, Colorado 8D277 <br />(303) 989-0300. Omnitaz (303) 989-1655 <br />October 23, 1992 <br />Mr. Carl Mount <br />Senior Reclamation Specialist <br />Division of Minerals and Geology <br />1313 Sherman St - Room 215 <br />Denver, CO 80203-2273 <br /> <br />OCT 2 3199 <br />DIVISION . <br />MINERALS & GEC <br />RE: MLRD Permit #M-73-021 <br />Request for Administrative Decision Regarding Limit of <br />Excavation, Morrison Quarry <br />Dear Mr. Mount: <br />~;I~ <br />On October 16, 1992, at our request, we were visited by Bill <br />York-Fiern, an inspector from your division, with regard to a <br />hazardous slope failure situation, which has developed on the <br />west facing highwalls of our Quarry. Subsequently, on Monday, <br />Octaber 19, 1992, we were inspected by an MSHA team due to the <br />above concern. Pursuant to that inspection, MSHA mandated that <br />we reduce the highwall slopes within a short time frame, in order <br />to mitigate a potentially life threatening situation. <br />Due to the nature of this emergency we are requesting that we be <br />allowed, through your administrative decision, to increase the <br />outer limits of our excavated slopes to the east, by as much as <br />200'. This is well within our permit boundary. The approval of <br />this increased limit of excavation will not alter the visual <br />impact of the Quarry to the residents east of us. The urgency of <br />this situation requires an answer from MLRD by October 28, 1992. <br />We are concurrently seeking approval from Jefferson County, and <br />because of the emergency nature of our request, expect immediate <br />approval. We fully understand the need for an amendment to our <br />mine plan in order to fulfill the regulatory requirement of an <br />increase in the mining boundary within the permit area. We will <br />be more than happy to comply with an amendment subsequent to an <br />administrative decision to approve the new limit of excavation <br />for this emergency situation. The amendment would include <br />highwall, bench, and backfill specifications both in plan and <br />profile, and other documentation if required. <br />Prior to Wednesday, October 28, we would welcome a site tour by <br />the Division staff, so that the new limit of excavation can be <br />physically observed within the Quarry. <br />