My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21582
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:38 PM
Creation date
11/21/2007 10:00:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977197
IBM Index Class Name
Enforcement
Doc Date
3/24/1999
Doc Name
UNPERMITTED CONSTRUCTION MATERIAL EXTRACTION OR EXPLORATION OPERATION PRESENTATION FORM
Violation No.
MV1999007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 111 IIIIIIIIIIIII III • <br />~~ <br />UNERMiTTED CONSTRUCTION MATERIAL EXTRACTION <br />GENERAL INFORMATION <br />OR EXPLORATION OPERATION <br />Presentation Form <br />~,ti~ <br />~~ <br />Inspection Date: 2/3/99 File No.: M-77-197 <br />Operator: Hard Rock Paving and Redi-Mix, Inc. Landowner: Hard Rock Paving and Redi-Ntix, Inc. and BLM <br />Commodity: S & G Acres affected: 22+ <br />County: Chaffee Method of Mining: Conventional <br />Specialist: James C. Stevens <br />WAS THIS CASE THE RESULT OF A ROUTINE INSPECTION? YES <br />OR COMPLAINT? NO <br />A CEASE AND DESIST ORDER WAS NOT ISSUED TO THE OPERATOR BECAUSE: Thi; is a <br />permitted operation. <br />DIVISION'S REASON FOR BRINGING THIS TO THE BOARD AS MINING WITHOUT A PERMIT <br />VERSUS MINING OUTSIDE THE PERMIT BOUNDARY: The mine operates under a 110 permit however <br />there are more than 22 acres of mining related disturbance identified at the site. <br />(DMG Policy -For any 110 type operation, if the operator affects greater than two acres, the operator shall be found <br />for mining without a permit. For all other permitted operations, mining without a permit shall be determined on <br />a case-by-case basis. items to consider include the amount of disturbance, type of distwbance, ownership of the <br />distwbed azea, impact to the suaounding area due to the disturbance, degree of any health or safety hazard.) <br />NATURE OF UNPERMITTED (Construction MaterialsExplorarion C.M.E. or Exploration Operation E.O.) (To <br />be completed by the staff) <br />Est. Acreage disturbed (Do not use for permitted sites): 22+ <br />Est. Vol. Removed: No estimate possible. <br />Est. Ac. outside permit boundary: Approximately 13 <br />SERIOUSNESS (To be completed by the staff) <br />Operator conducted activity on own property: Yes, on others property: Yes <br />Site activity, describe: There are an estimated 13 acres of mining related disturbance outside of the approved 9.2 <br />permidaffected area. <br />Area wide impacts, describe: None <br />Health or safety hazard, describe: None <br />STATUTE VIOLATED AND DESCRIPTION (To be completed by staff) <br />X C.R.S. 34-32.5-109(1) mining without a permit pursuant to C.R.S. 34v2.~-123 ('_). <br />C.R.S. 34-32.5-1 l3(1) exploring without an approved NOI. <br />C.R.S. 34-32.5-109(1), or 113(1) <br />
The URL can be used to link to this page
Your browser does not support the video tag.