My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21514
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:36 PM
Creation date
11/21/2007 9:59:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
7/18/2001
Doc Name
NOV CV-2001-011 COLOWYO COAL MINE PN C-81-019
From
DMG
To
COLOWYO COAL CO LP
Violation No.
CV2001011
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o~ ~~ <br />ni ~8 <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />.~: <br />"" ~ 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />SETTLEMENT AGREEMENT <br />NOV/CO NO.: CV-2001-011 <br />MINE: Colowyo Coal Mine <br />PERMITNO.: C-]981-019 <br />OPERATOR/PERMITTEE: <br />Colowyo Coal Company L.P. <br />ATTENTION: James A. Kiger <br />ADDRESS: 5731 State Highway 13 <br />Meeker, CO 81641 <br />DATE ISSUED: May 16, 2001 <br />TYPE OF MINE: Surface/Federal <br />COUNTY: Moffat <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on July 18, 2001, the Division and the operator hereby <br />agree as follows: <br />1. The amount of the penalty shall be $500.00; <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from <br />the date this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of al] further rights <br />to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is se[ forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: <br />By <br />OF MINERALS AND GEOLOGY: <br />By <br />By <br />Officer <br />Division Director ~ ~(~L~ <br />DATE: <br />DATE: ~~ ~ <br />Penalty Adjustment Reviewed <br />[Rule 5.04.3(4)(c)] <br />CRS 3433-123(8)(c) and (d) <br />
The URL can be used to link to this page
Your browser does not support the video tag.