Laserfiche WebLink
'pQ_y <br />III IIIIIIIIIIIII III <br />999 <br />PEABODY COAL COMPANY <br />Western Division <br />September 26, 1990 <br />1300 Soulh Vale <br />FlagStaX, Ariiona 66001 <br />(602) 7745253 <br />RECEI~/EI <br />Mr, Carl Mount <br />Colorado Mined Land Reclamation Division OCT j tca~ <br />1313 Sherman Street <br />Denver, Colorado 80203 Mined Lan-~ <br />fleclamation Division <br />RE: Nucla Mine Permit C-81-008, NOU C-98-035 <br />Dear Mr. Mount: <br />Ron Gehrke made a site inspection of the Nucla Mine on <br />September 22, 1990 to perform routine impoundment <br />inspections and to follow up on the abatement activities <br />on the above referenced NOV. First, Mr. Gehrke inspected <br />topsoil pile 8 and agrees that the straw bales that were <br />placed on the southwest side of the stockpile should be <br />extended further north on the west side of the pile to <br />ensure no loss of topsail due to runoff into the adjacent <br />ditch. Also, additional bales will be placed around the <br />south side of stockpile 8 as shown on the attached revised <br />Figure 1. <br />Second, regarding topsoil pile 13, the catchment ditches <br />and basin were incorrectly shown on the north side of the <br />pile in the September 13, 1990 submittal. Attached Figure <br />1 has been revised to show the correct alignment and <br />placement of the catchment basin and ditches. The ditches <br />will divert any runoff from the pile to the basin to <br />ensure no topsoil resource is lost. <br />As shown on the SEDCAD+ model results (Attachment 1 to the <br />September 13, 1990 letter) the capacity of the catchment <br />basin needs to be G.06 acre feet. Attachment 2 shows a <br />schematic cross-section of the catchment basin. From that <br />drawing, assuming average storage depth of 2.5 feet and <br />minimum bottom width of 10 feet, the catchment basin will <br />be approximately 75 feet long for the required storage. <br />