Laserfiche WebLink
<br />6. WFU should address inlet protection for the pond since discharge from the drill hole <br />may be as high as 200 gpm. <br />7. WFLJ should include details on the culvert to be installed under the SDH#4 access <br />road, specifically the following: <br />1. What is the length of the culvert? <br />2. At what slope will it be installed? <br />3. What is the height of headwater and/or tailwater? <br />If you or anyone from WFiJ have any questions, let me Irnow. <br />SLM\040793B. WP <br />Janet Binns 2 April 07, 1993 <br />