Laserfiche WebLink
J. E. STOVER & ASSOCIATES <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (303) 245-4101, FA% 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />III IIIIIIIIIIIII III <br />sss <br />CIVIL 6NGINSERING <br />CONSTRUCTION MANAGEMENT <br />January 31, 1994 <br />S. S. Shuey <br />Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bear Coal Company, Inc. <br />Mine Plan Revision, PR-O1 <br />Permit C-81-033 <br />_'_~. ,~~ <br />5~., ~,~ <br />J .~~ <br />i, . <br />,. ,. ~ .. <br />Dear Mr. Shuey: <br />My letter to the Division dated January 17, 1994, informed it that <br />mining conditions in the First North Maine deteriorated west of panel <br />7 off of the First West Mains. Bear has decided to pull out of the <br />First North Mains and mine the panel at the end of the Second West <br />Mains to allow the Division time to approve the referenced permit <br />revision. <br />Enclosed is the revised B-Seam Mine Plan Map, Map 9A, which presents <br />the "new" mine plan which incorporates the fact that mining will not <br />progress north of the point where mining in the First North Main was <br />terminated. Also enclosed are the following listed pages that were <br />revised because of this mine plan modification: <br />Pace Description of Change <br />2.03-15 Removed the N/2NW/4 of Section 17 from the description of <br />land for which the Operator is negotiating with Atlantic <br />Richfield Company to obtain mining rights. <br />2.05-4 Updated 1993 production. Deleted projected production in <br />1998. <br />2.05-7 Revised discussion of mining plane and projections. <br />Please call if you have any questions. <br />Sincerely, <br />A.r <br />Jim Stover, P.E. <br />Consulting Engineer <br />cc: W. A. Bear, Jr. <br />