Laserfiche WebLink
<br />• iii iiiiiiiiniiiiii <br />S TJTE OF COLO R,>DO 9iC 44f1D D. ~AAM. Gavr•~nrv 999 <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Mon[e Pascoe, Executive Director <br />KILNED LAND RE(:L~_VI.~TION <br />423 Centennial Building, 7373 Sherman Stre?r <br />Denver. Colorado 80203 Tel. (303) 865-3567 <br />David C. Shelton <br />Director <br />SETTLEMENT AGREEMENT <br />MINE NAME: North Thompson Creek Mine <br />PERMITTEE: Snowmass Coal Company <br />MAILING ADDRESS: P.O. Box 980, Carbondale, Colorado 81623 <br />OPERATOR (If Other Than Permittee): same <br />MAILING ADDRESS: Same <br />COUNTY: Fitkin and Garfield TYPE OF MINE: underground coal <br />PERMIT NO.: 7~-313 VIOLATION NO.: s1-29 <br />The Mined Land Reclamation Division ("the division") issued a certain notice of <br />proposed amount of civil penalty, and the operator requested a conference theron, as <br />authorized by C.R.S. 1973, 34-33-123(8). The requested conference having been held <br />as required by law, the Division and the operator hereby agree as follows: <br />1. The amount of the penalty shall be S 900.00 ; <br />2. The penalty shall be paid to the Division by the operator not later than 30 <br />days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver of all fur- <br />ther rights to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days <br />after the closing date of such conference, which date is set forth below opposite the sig- <br />nature of the conference officer. If not so signed, the Division will fix the penalty at <br />whatever amount it deems appropriate based upon the factors referred to in C.R.S. 1973, <br />34-33-123-(8)(d). <br />DATE: /%-~~~~~ <br />DATE: November 30, 1981 <br />OPERATOR: <br />BY. <br />DIVI ~I,O~N~O MI LAD ECLAMATION <br />BY: !e%liGlA ~. <br />David C. Shelton <br />Conference Gfficer <br />2/81 C.R.S. 1973, 34-33-123(8)(c)(d) <br />