Laserfiche WebLink
. .. ~ • <br />-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No. NOV C-84-137 <br />NATURE OF VIOLATION: <br />The permittee has failed to certify that the haul road from the county road to the <br />pit and along the west side of the pit has been constructed as designed and approved. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT SECTION(S) 34-33-120(6) 34-33-123(2) <br />REGULATION SECTION(S) 4.03.1(1)(d) 5.03.2(2)(a) <br />PERMIT SECTION(S) Exhibit I, J. <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />The constructed haul road running from the county road to and along side the pit. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />Provide certification by a Colorado registered professional engineer that the haul <br />road has been constructed as designed and approved. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE 19 <br />by August 2, 1984. <br />(Rev. 6/84) <br />Doc. No. 221 <br />