October 17, 1997 <br />Mr. Harry Ranney <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />215 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203-2273 <br />~r_r`~It;I=D <br />ul;l Z p 1997 <br /> <br />RE: Technical Revision 30 -Pond Removal As-Built and Suspension of Hydrologic <br />Monitoring -Chimney Rock Mine (Permit No. C-81-023) <br />Dear Mr. Ranney: <br />Kaiser Ventures, Inc. hereby submits Technical Revision 30 which provides a certified as-built for <br />the removal of ponds and ditches located on the reclaimed areas of the mine site as a result of Phase <br />11 bond release. The certification should be placed in the front of Exhibit 7, Sediment Control <br />Design Criteria, and the map replaces Map 8, Drainage Control of the permit document. <br />Kaiser also requests suspension of the current surface and groundwater monitoring program as a <br />result of Phase II approval and elimination of the sediment control system. All wells and surface <br />stations will remain in place and will be sampled in anticipation of Phase III release as that process <br />begins in the year 2000. Hydrologic reporting is also requested to be suspended until sampling <br />resumes. The 1997 monitoring report will be submitted in January 1998 for data collected during <br />the quarterly sampling this year. <br />Should you have questions or need additional information concerning this request, please do not <br />hesitate to contact Mr. Mike Keegan or let me know. <br />Sincerely, <br />~~ ~~ <br />Jerry H. Koblitz <br />Principal <br />Attachments <br />cc Mike Keegan -Kaiser Eagle Mountain <br />5990 Greenwood Plaza Blvd. • Suite 250 • Englewood, Colorado 801 I l <br />Phone (303) 850-0930 Fax (303) 721-9298 <br />Environmental Planners, Scientists artd Engineers <br />