Laserfiche WebLink
III !I(IIIIIIIIIIIII <br />~ MINED LAND RECLAMATION DIVISION <br />STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES <br />NOTICE OF VIOLATION NOV No. C-~y~-D23 <br />Permit No.: t"-RI.OZCI Mine: ,YOy,-~~,~ ~-(IV1Pe <br />Type of Mine• 1)(n 1 ~/,~Q,vr,~ County: G~ pQ(~ <br />Operator (If Other than Permittee): Permittee: ~iyC.NY,( t/ues[1Lca (1}7, Q fn. <br />,~(~-~,e Mail Address: t~,~• ej0}( Ff-C~ <br />Mail Address: ~~(~A (,pyyY~ C,c~ B~Sd~{ <br />Date/Time of Inspection: <br />Inspector: ~r~ Q~? ~q y $ •. 3~ a . yy, , <br />~ `„ . <br />so+~t~ °l <br />Signature of person served <br />(P1 QLerPR ,~ ~y~ ~c~ <br />ease prin name and tit e <br />Served 8y. <br />~t'.1,~ ~. ~SV ~Y <br />~~ignature of authorized repr entat ve <br />of Mined Land Reclamation Division) <br />Date and Time of Service: <br />" ~ A.M. <br />CERTIFIED MAIL N0. UCY[it ~12L19`f P.M. <br />Return Receipt Reques e <br />The Mined Land Reclamation Division ("the Division") has conducted an inspection of <br />the above mine and has made the findings stated in the attached schedule and has <br />found violations of the Colorado Surface Coal Mining Reclamation Act, or violations <br />of required permit conditions, listed in the attached schedule. This notice <br />constitutes a separate notice of violation for each violation listed. <br />You must abate each of these violations within the designated abatement time. <br />Where the remedial action requires submission of plans, the plans are to be <br />submitted to the Division within the designated time. You are responsible for <br />doing all work in a safe manner in compliance with all applicable laws and <br />regulations. <br />The undersigned finds that cessation of mining is is not / expressly, or in <br />practical effect, required by this notice. For this purpose, m Wing" means <br />extracting coal from the earth or from a waste pile and transporting it within or <br />from the mine site. <br />I <br />C.R.S. 1973, 34-33-123(8) provides for imposition of civil penalties of up to <br />b5,000 for each violation and provides that each day of continuing violation may be <br />deemed a separate violation. <br />Important: Please read the reverse side of this page. <br />