My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-07-09_REVISION - M1980085
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980085
>
2007-07-09_REVISION - M1980085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:20 PM
Creation date
11/21/2007 9:56:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980085
IBM Index Class Name
Revision
Doc Date
7/9/2007
Doc Name
Submittal
From
Greg Lewicki & Associates
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Revegetation Success Criteria <br />It is suggested that revegetation in should be deemed successful when accepted by the Division <br />of Reclamation, Mining and Safety. <br />The revegetated area will be monitored for success of reclamation until accepted by the Division <br />of Reclamation, Mining and Safety. If revegetation failures occur prior to release, an analysis of <br />the site will be made and the area will be revegetated again as necessary. <br />7. Monitoring Reclamation Success <br />Monitoring the reclamation on an ongoing basis will allow minor revisions to assure successful <br />reclamation. The operator plans to use the local NRCS office to assist in detemuning the ability <br />of the reclaimed land to control erosion. If minor changes or modifications are needed to the <br />seeding and reclamation plan, revision plans will be submitted to the Division of Reclamation, <br />Mining and Safety as required. It is hoped that the Division of Reclamation, Mining and Safety <br />will provide assistance in evaluating the success of the ongoing reclamation process. All areas <br />disturbed and reclaimed and any other important items regazding the reclamation will be <br />submitted in the annual reports to the Division of Reclamation, Mining and Safety. <br />Yagneur Pit June 07 E-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.