Laserfiche WebLink
<br />EXHIBIT L - RECLAMATION COSTS <br />Mining of the site will create an area of approximately <br />48 acres to reclaim. Reclamation will be done in conjunction <br />with the operation, thus the following estimates are probably <br />somewhat conservative. Reclamation tasks are based on a site <br />of approximately 48 acres. The remainder of the site is to <br />remain undisturbed. <br />- Seed and Seeding- $150Jac X 48 ac. _$ 7200.00 <br />- Ripping and discing- $100/ac X 48 ac.=$ 4800.00 <br />- Fertilize- $70/ac x 48 ac =$ 3360.00 <br />- Mulch 2 tons Jac. mechanically crimped <br />$240/ac X 48 ac. =$11520.00 <br />- mobilize/ demobilize equipment =$ 500.00 <br />- Grading- $750/ac X 48 ac. =$36000.00 <br />- Topsoil replacement- 4 to 6 inches of <br />topsoil, using a 621-B scraper and D-4 dozer <br />Average $.90/cu. yd. =$27900.00 <br />TOTAL =$91,280.00 <br />