My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08764
DRMS
>
Back File Migration
>
Revision
>
REV08764
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:19 AM
Creation date
11/21/2007 9:56:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
7/30/2007
Doc Name
Fax of Proposed Decision to OSM
From
Dan Hernandez
To
Carl Johnston
Type & Sequence
TR109
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Cdorado 80103 <br />Phone: (303) 8643567 <br />FAX: (303) 8324106 <br />July 24, 2007 <br />Henry Bazbe <br />Mountain Coal Company, LLC <br />P.O. Box 591 <br />Somerset, CO 81434 <br />Re: West Elk Mine (Permit No. C-1980-007) <br />Proposed Decision -Technical Revision No. 109 (TR-109) <br />Deer Creek Shaft <br />Deaz Mr. Bazbe: <br />COLORADO <br />DIVISION O F <br />RECLAMATION <br />MiN[NG <br />- &- <br />SAFETY <br />ere Rives, u. <br />forernor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Grtany <br />Division DireROr <br />Natural Resource Truuee <br />Enclosed you will fmd the Division of Reclamation, Mining and Safety's Proposed Decision for Technical <br />Revision No. l09 at the West Elk Mine. Notice of the proposed decision will be published in the Delta <br />County Independent as soon as possible. The first publication wil[ initiate the ten (l0) day public comment <br />period for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Btueau of Land Management. The material <br />should be sent within l5 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that <br />equals or exceeds the Revised Liability. This Technical Revision must not be implemented until this <br />proposed decision becomes final and until any required increase in bond is submitted to and approved by the <br />Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />J ~ ~C~~ <br />Tom Kaldenbach <br />Environmental Protection Specialist <br />Enclosure <br />cc: Cazl Johnston, Office of Surface Mining, with enclosures <br />C-TR-0bjq)}{~@Qq! TAK_07Z420U70{i723.ax 0f8ce Of <br />Mined land Reclamation Denver • Grand Iurredon Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.