Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Sheet 1 of 2 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 09c State :Colorado PermiUjob # : C-80.007 <br />Date : 07242007 County :Delta Abbreviation :none <br />User: TAK Site : West ElkMrrre Filename:0007-09c <br />Permit or otherjob action :TR-109 <br />Task description : Backfill Deer Creek vent and <br />HOURLY EQUIPMENT COST <br />Truck/loader team -Truck :Generic 15-18 cy 6x4 <br />-Loader :CAT 966G high lilt (2002, <br />>port equipment -Load area : NA <br />-Dump area :Cat D8R Sedes 11 - 8SU I <br />maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker. 3.500 G»l. <br />shafts with <br />Shift basis : 1 per day <br />Cost Breakdown : ruck/LOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA dozer grader misctruk <br />%Utilization-machine: 100 40 NA 100 20 700 <br />-Ripper attachment: NA NA NA 0 0 NA <br />Ownership cosUhour: $18.41 $29.75 NA $51.18 $32.69 $10.78 <br />Operating cesUhour: $49.85 $15.36 NA $73.75 $8.18 $23.94 <br />Ripper op. cesUhour: NA NA NA $0.00 $0.00 $0.00 <br />Operator cosUhour: $21.75 $32.78 NA $32.78 $24.47 $34.24 <br />Unit subtotals : $90.01 $7789 NA $157.70 $85.34 $68.97 <br />Number of units : 8 2 0 1 1 1 <br />Group subtotals : Work : $875.86 Support : $157.70 Maintenance : $134.31 <br />Total work team cosUhour: $1,167.87 <br />...................................... . <br />:: : ; ::;: <br />:.;. ;: <br />,, <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,942 LCY factor : NA volume : 6.942 LCY <br />Descr. <br />Material weight : 3,250 pounds/LCY Struck volume : 15.00 LCY <br />el - Pitrun Heaped volume : 18.00 LCY <br />Rated payload : 63,980 pounds Average volume : 16.50 LCY <br />Payload capacity : 19.69 LCY Adjusted volume': 18.00 LCY <br /> Final truck volume based on number of loader passes : 16.62 LCY <br /> 'truGc volume adjusteE to not enceed rated payloaC or heaped volume <br />Loading Tool Caoacily <br />Rated capacity (nom. heaped) : 4.750 LCY <br />Descr.: Loose material - 12" to 3/4" (85 - 90%J <br />Bucket fill factor : 0.875 <br />Adjusted bucket capacity : 4.158 LCY <br />rections : Site altitude (ft.) : 6,300 <br />Truck ~ Loader Source <br />1.000 0.920 (Cat HB <br />Net correction :~ 0.830 ~ 0.784 <br />