Laserfiche WebLink
i <br />March 3, 1997 <br />-6- <br />963-2178400.410 <br />construction, and can then implement remedial actions or revised <br />designs, if required, and, <br />- The post-reclamation slopes will be re-analyzed using the site specific <br />material data obtained from the geotechnical investigation and during <br />construction. The stability analyses will be performed at specific <br />facilities using site specific parameters: <br />6.0 REFERENCE <br />r <br />Hunt, R.E., 1983, "Geotechnical Engineering Investigation Manual," McGraw-Hill. <br />Sincerely, <br />GOLDER ASSOCIATES I`iC. <br />~~~ ~~~ <br />LeeAnn Bush, P.E. Charles H. Robinson <br />Geotechnical Engineer Associate <br />LB/CHR/jck <br />va:we~~nev neeMq.ooc Golder Associates <br />