My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21252
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:26 PM
Creation date
11/21/2007 9:56:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
6/26/1995
Doc Name
COLOWYO COAL MINE PN C-81-019 SETTLEMENT AGREEMENT NOV C-95-005
From
DMG
To
COLOWYO COAL CO
Violation No.
CV1995005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman Si., Room 215 <br />Denver, Colorado 80203 <br />Phone: 13031 866-3567 <br />FAX: (3071 832-81 D6 <br />SETTLEMEPIT AGREEMENT <br />Cessation Order No. <br />Notice of Violation No. C-95-005 <br />I~~~~ <br />DEPARTMENT OI <br />NATURAI <br />RESOURCE' <br />Roy Romcr <br />Governor <br />IamesS Luc hhead <br />Exrcmrve Direao~ <br />Mine:COlowyo Coal Mine Permit No. C-81-019 m'~naeiR 1on~; <br />D~reaor <br />Permittee: Colowyo Coal Comoanv <br />Mailing Address: 5731 Highway 13, Meeker. CO 81641 <br />Operator: (If other than Permittee): <br />Mailing Address: <br />County: Moffat Type of Mine: Surface/Federal <br />The Division of Minerals and Geology ("The Division") issued a certain <br />Notice of Proposed Amount of Civil Penalty, and the operator requested <br />a conference thereon, as authorized by C.R.S. 1973, 34-33-123(8). <br />The requested conference having been held as required by law, on June <br />12. 1995 the Division and the operator hereby agree as follows: <br />1. The amount of the penalty shall be $350.00 <br />2. The penalty shall be paid to the Division by the operator not <br />later than 30 days from the date this agreement is signed by <br />all parties; <br />3. Payment of such penalty by the operator shall constitute a <br />waiver of all further rights to review of such penalty or of <br />the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator <br />within ten days after the closing date of such conference, which date <br />is set forth below opposite the signature of the Conference Officer. <br />If not so signed, the Division will fix the penalty at whatever amount <br />it deems appropriate, based upon the factors referred to in C.R.S. <br />1973, 34-33-123(8)(d). <br />OPERATOR: <br />DATE: <br />DATE: ~~~ ~~I~RS <br />Penalty Adjustment Reviewed <br />(Rule 5.04.31411c11 <br />C.R.S. 34-33-1231811c11d1 <br />By: <br />DIVISIOn/N _~OF'~ MINF.RAi 4 AND GSOIAGY: <br />By ~1"Am~A tiA - O~ ~'~fL rr-~ <br />reference Officer <br />By <br />Di 'sion ire kQr <br />
The URL can be used to link to this page
Your browser does not support the video tag.