My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21231
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:25 PM
Creation date
11/21/2007 9:56:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Enforcement
Doc Date
3/1/1993
Doc Name
NOV C-92-038 PN C-81-041
From
POWDERHORN COAL CO
To
DMG
Violation No.
CV1992038
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POWDERHORN <br />COAL COMPANY <br />February 26, 1993 <br />III IIIIIIIIIIIII III <br />sss <br />P.O. Bo. ta30 <br />Palisade, Goloratlo 87526 <br />1303) 4847951 <br />Fax (303) 4847181 <br />RECEIVED <br />Ms. Janet H. Binns <br />Reclamation Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />Re: NOV C-92-038, Permit No. C-81-041 <br />Dear Ms. Binns: <br />MAR 11993 <br />Division of Minerals 8 Geology <br />Powderhorn respectfully requests an additional extension of time <br />to complete abatement of installation of rip rap in collection <br />ditches at CRDA No. 1 and CRDA No. 2. Winter is generally not a <br />good time to work on outslopes of refuse piles and this winter <br />has been no exception. The above normal precipitation has made <br />access to the refuse pile and to the source of rip rap extremely <br />difficult. <br />So far approximately 500' of rip rap has been placed of the 1400' <br />required. This 500' along a gravel road has been difficult but <br />the remaining 900' will require access across refuse which <br />becomes impassible when wet. March is generally a wet month <br />also, therefore, it is difficult to estimate how much additional <br />time will be necessary. I will keep you posted. <br />The other two items in subject NOV, the two culverts and the CRDA <br />No. 1 bench 3 drainage, have been taken care of. <br />Thanks for your assistance. Let me know if you have any <br />questions. <br />Sincerely, <br />rry Reschke <br />Engin er <br />LMR:jP <br />cc: W. C. Jennings, PRCC <br />D. A. Jenkel, PRCC <br />
The URL can be used to link to this page
Your browser does not support the video tag.