Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />~~.r - _~ <br />~~~ ~ E 1993 <br />pi;•i~;"~ ~; : ; <br />n.. <br />:Y <br />December 3, 1993 <br />Mr. Joseph Dudash <br />Colorado Division of Minerals and Geology <br />1313 Sherman Rm. 215 <br />Denver, CO 80203 <br />Subject: Technical Revision 31 and. NOV C-93-015, River Ponds, <br />Golden Eagle Mine, Basin Resources, C-81-013 <br />Dear Mr.. Dudash, <br />~, <br />r..~ <br />Mr. Ralph Lopez asked Grey~toiie;to clarify that the certification <br />of Ehet'Golden:'Eagle River Ponds was?gin As-Built, and to modify the <br />map,:,.to document that fact. Please '-file the enclosed copies <br />accordingly. <br />Sincerely, <br />(~~~~ «-e (/v <br />Catherine W. Begej <br />Project Manager <br />cc Mr. Ralph Lopez <br />Enclosures <br />5990 Greenwood Plaza Blvd. Suite 250 Englewood, CO 80111 <br />(303) 850-0930 Fax (303) 721-9298 <br />