My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21201
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:24 PM
Creation date
11/21/2007 9:56:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Enforcement
Doc Date
3/4/1985
Doc Name
ABATEMENT PROCEDURES FOR NOV C-85-004 WYMONG FUEL CO NEW ELK MINE PN C-12-81
From
WYOMING FUEL CO
To
MLRD
Violation No.
CV1985004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~iiiiiiiiiiiiiiuiii <br />999 <br />Wyoming Fusl Compony <br />[2055 W. Second Place • P.O. Box [5596 • Lakewood. Colorado 80215 • Telephone (3031989-5037 <br />RECEIVED <br />March 1, 1985 Mai ~ i?3J <br />MINED LAND RECLAMATION DIVISI011 <br />Colo. Dept. of Natural Resources <br />Mr. Greg Squire <br />Mined Land Reclamation Division <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Abatement Procedures for NOV C-85-004, Wyoming Fuel Company (WFC), New Elk <br />Mine, Permit No. C-012-81. <br />Dear Mr. Squire: <br />I am requesting a 30 day extension for partial abatement of the above notice of <br />violation. Nan effort to prevent unwanted thickener and wash plant discharge to ponds <br />006 and 007 WFC will be installing a clarified water circuit. This circuit will take clear <br />water from the thickener for reuse in the wash plant. The electrical and concrete work <br />for this circuitry is complete. The pump has been ordered and will be shipped on March 1, <br />1985. Considering shipping time and construction the new circuit should be in operation <br />by the third week in March. <br />During this interim period, it may be necessary to discharge thickener overflow and <br />totally empty the thickener. I would like to use pond 006 for this purpose. Water will be <br />held in this pond and discharged when NPDES effluent limitations are met. The only risk <br />involved in doing this would be the chance of receiving a 10 year, 24 hour storm event at <br />the same time the thickener was being emptied. This is a low risk during March. Sump <br />water from the plant will report to the thickener. <br />After the new circuiting is installed, it will still be necessary to empty the thickener <br />two (2) or three (3) times per year for maintenance. Initial calculations show the <br />thickener volume can be handled by distributing this volume between ponds 006 and 007. <br />The thickener volume represents 2.16 acre feet. The combined excess storage capacity of <br />ponds 006 and 007 also equals 2.16 acre feet providing a 60% sediment level is maintained <br />(see calculation sheets attached). <br />
The URL can be used to link to this page
Your browser does not support the video tag.