Laserfiche WebLink
EHr Oi l <br />a P`"~ ~ `_~y~ U. S. DEPT. OF THE INTERIOR <br />g OFFICE OF SURFACE ~G RECLAMATION AND ENFORCER <br />• ,,9g, _,H,q ~ Mine-Site E~~r~ al~n Inspection Report <br />~~~ ~~~~~~~~~~~~~~~~ o <br />999 <br />z <br />:~~_ <br />CFOs 111RFALF'~ <br /> <br />~iV 10. T <br />~ <br />1. Perminee/Person rSi <br />00 pi ~. <br />~ 9. Permit Number a. Pe <br />mut b. RA <br /> WALDEN COAL CO. • as 6 GeOlor, C-021-81 PP ~S <br /> 2. Address 11. Inspection Date 12. Inspection Type 13. Joint Inspection <br /> <br /> P.O. BOX 229 ~ 12/13/94 C~ ~X YlN <br /> <br />3. City <br />4. State NM~DD-rr <br />14. Permit Status <br />15. Site Status 16. Facility Type <br />BOULDER ~ CO A~ Pl L^~ <br />5. Zip Code 6. Phone Number ] 7. OSM Office # 18. RSI # 19. Land Code <br />$0306 -~ 303-444-2151 020 <br />7. Ope2tor if Different than Perm ittee 20. M.S.H.A. ID # 21. State Code 22. Counly Code <br /> <br /> OS03517 08 057 <br /> 8. Mine Name 23. AV S Perminee Entity ID Number 23b. Stare Office <br /> BOURG STRIP ~ 056841 <br />24. Performance Standard Categories <br />Codes: 1=Com licence 2=Noncom licence 3=Not Plana 4=Not S -Noncom licence Identified Elsewhere <br />A. Administrative D. Backfilling & Grading H. 3 Subsidence Control Plan <br />]. 1 Mining within Valid Permit 1. 3 Exposed Openings I. Roads <br />2. 1 Mining within Bonded Area 2. 1 Contemporaneous Reclamation 1. 1 Road Constmction <br />3. 1 Terms & Conditions of Permit 3. 1 Approximate Original Contour <br />- 2. 3 Certification <br />4. 1 Liability Insurance 4. 1 <br />llighwall Elimination 3. 3 Drainage <br />5. 1 Ownership and Control 5. 3 Steep Slopes (includes dovmslope) 4. 3 Surfacing and Main[ettance <br />6. 3 Temporary Cessation 6. 1 Handling of Acid & Toxic Materials 5. 1 Reclamation <br />B. Hydrologic Balance 7. 1 Stabilization (rills and gullies) - <br />I. 1 Drainage Control E. Excess Spoil Disposal J• Signs & Markers <br />2. 3 Inspections & CeWcations I. 3 Placement 1. 1 Signs <br />3. 1 Siltation Structures 2. 3 Drainage Control 2. 1 Markers <br />4. 3 Discharge Structures 3. 3 Surface Stabilisation K. 1 Distance Prohibitions <br />5. 1 Diversions 4. 3 Inspections & Certifications - <br />6. l Effluent Limits L. Revegetalion <br />7. 1 Ground Water Monitoring F. Coal Mine Waste 1. 1 Vegetative Cover <br />8. 3 Surface Water Monitoring (Refuse Piles/lmpoundments) 2. I Timing <br />9. 3 Drainage -- Acid-Toxic Aaterials 1. 3 Drainage Control <br />10.3 Impoundments 2. 3 Surface Stabilization M. 1 Postminiog Laod Use <br />l 1. 3 Stream Buf(erZones 3. 3 Placement <br /> 4. 3 Inspections and Certifications N. Other <br />C. Topsoil & Subsoil S. 3 Impounding Structures <br />1. 1 Removal G. Use of Explosives -I) <br />2. 1 SubstituteMaterials 1.3 BlasterCertiFication <br />2) <br />3. 1 Storage and Protection 2. 3 Distance Prohibitions - <br />4. 1 Redistribution 3. 3 Blast Sttrvey/Schedtile 3) <br /> 4. 3 Warnings & Records _ <br /> 5. 3 Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a Date of last <br />Stye Complete <br />Inspeaion OS13ll94 <br /> <br />$.0 a. Permit Review <br /> <br />122.7 a. Total <br /> <br />bonded <br /> <br /> <br />73.0 a <br />Pemtitted <br />Frequency rot prevlout 4 Calendar Qtrs b. Phase 1 . <br />b. N~umberol Num~r of <br />aired ^ wm to C~ <br />4 <br />5 4.0 b. Inspection Time 122.7 released 122.7 b. Disnabed <br />~pediorts <br />~uCeE <br />l T <br />T <br />6'~ <br />~•~ c. Phase II <br />released (Estimated) <br />c Number of Number of rave <br />une <br />c. <br />^8 P~~ . r ^ l <br />uel~ ins dions 1~ I 2.U <br /> <br />Re <br />ort Writin <br />d O.U d. Phase III <br /> <br />l <br />d g <br />Pa e 1 of 3 <br />atspeaiors cottluaed p <br />g <br />. re <br />ease ....r+a 4 <br />