Laserfiche WebLink
-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV-2005-001 <br />NATURE OF VIOLATION: <br />Failure to construct and/or maintain the embankment for Sediment Pond B as necessary to ensure the <br />inte~ity and stability of the pond embartlaxtent. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT <br />SECTION(S) <br />REGULATION <br />SECTION(S) 4.05.6(21 and 4.05.9(61 <br />PERMIT <br />SECTION(S) <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />_This notice applies to the construction and/or maintenance of the embankment for Sediment Pond B, <br />resultine from evidence of instability of the embankment observed during the January 26, 2005 <br />inspection. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />Steps necessary to abate this violation are to excavate the failed portions of the embankment and <br />reconstruct the embankment in accordance with approved designs and the applicable requirements of <br />Rules 4.05.6, 4.05.9(11.4.05.9(6), 4.05.9(71. and submit a P.E. Certification of the reconstructed <br />embankment in accordance with Rule 4.05.9(14) to the Division by Februar~22, 2005. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE February 22, 2005 <br />NOV Foxht(3/95) <br />WHITE -File YELLOW -Operator PINK -Specialist <br />