Laserfiche WebLink
.' <br />• LVLVnALV ~1NGL LANL H1;GLAMAl1VN L1viJ1VN <br />• ~ <br /> ESTIMATING FORM - BULLDC WORK <br /> <br />TASK NO. ~,l1/d PREP. B1': DTM PERMIT NO. C-81-053 <br />DATE 12/27/89 <br />""""""""""" FILENAME: C053-10 <br />""""""" OPERATION: Blue Flame <br />""""""""""" <br />"""""""""""" <br />PERMIT ACTION Midterm Reviex <br />""""""""""""""""""""""""""""""""""""""" <br />"""""""""""" <br />TASK DESCRIPTION Spread topsoil on <br />"""""""""""""""""" lower slope and roads <br />""""""""""""""""""""" <br />"""""""""""" <br />HOURLY EQUIPMENT COST: Single, Dou ble, <br /> Labor or Triple <br />County: LA PLATA <br />""""""""""" Zone <br />" 1 <br />""""""" Shifts S <br />""""""""" <br />Machine Descript. CAT D8L with universal blade & 3-shank ripper <br />Cost Breakdown: Utilization Equipment <br />"""""""""""""" adjustment: Filename: <br />Ownership coat/hr = $49.37 N/A D8L-U3RP <br />Operating & overhau l cost/hr- Dozer = $45.57 (100%) """"""""" <br /> -Ripper = $0.49 (10%) <br />Operator cost/hr = $20.08 N/A Total Fleet <br /> --------- Cost/Hr: <br />Total Eqpt. Unit Cost/Hr = 5115.52 5115.52 <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 2200 LCY <br />Initial """""""""""" Swell Loose <br />Volume: 2,200.0 LCY Factor: N/A Volume: 2,200.0 1 <br />Source of quantity take-off: 8 inches over 2 acres <br />Source of est. swell factor: NA <br />HOURLY PRODUCTION: <br />Avg. push distance: 50.00 ft. <br />Unadjusted hourly <br />dozer production: 1873.40 LCY/hr <br />Material consistency: <br />Loose stockpile <br />""""""""""""""""""""""""""""""""""" <br />Avg. push gradient: +0.00 % <br />Avg. site altitude: 7500.00 ft. <br />Material weight 2300.00 lb/LCY <br />Mat. Descr.: """""""'" <br />GENERAL FILL <br />JOB COST: <br />Fleet size <br />Unit Cost <br />Job Condition Correction Factors <br />"""""""""""""""""""""""""""""""" <br />Onerator.......... 0.75 (f <br />Mat. consistency• 1.20 <br />Dozing method..... 1.00 (~ <br />Visibility........ 1.00 (s <br />Job efficiency.... 0.83 (7 <br />Transmission type. 1.00 (F <br />Grade adjustment.. 1.00 <br />Altitude adj. .... 1.00 <br />Material weight... 1.00 <br />Blade type........ 1.00 (~ <br />Net Job Correction 0.75 <br />Adjusted Unit Prod.: 1399.28 LC <br />Adjusted Fleet Production: 1399.28 LC <br />1 Dozers) Total Job Time: 1.57 He <br />"""""""" """"""""""" <br />$0.083 /LCY Total Job Cost: 5181.62 <br />