Laserfiche WebLink
The following stipulations have been resolved to the satisfaction of the Division: <br />Stipulation No. 32 <br />WIIIiIN 6O DAYS OF ISSUANCE OF THE RENEWED EDNA MINE PERMIT, THE PERMTITEE SHALL SUBMrT A <br />COMPLETE TECHNICAL REVISION APPLICATION TO TF{E DIVISION. THE REVISION SHALL UPDATE THE PROBABLE <br />HYDROLOGIC CONSEpUENCFS ANALYSIS IN THE PERMIT TO INCORPORATE RESULTS OF PAST WATER MONTI'ORING <br />IN 7NE PERMIT' AREA AND TO EVALUATE TLIOSF. RESULTS IN TERMS OF IMPACT'S TO THE HYDROLOGIC BALANCE. <br />THE REVISION SHALL ALSO AMEND THE HYDROLOGIC MONITORING PLAN TO ENSURE THAT ADI:OUATE DATA IS <br />OIITAINED TO CONTINUE TO MEET THE REQUIREMENTS OF RULE 2.OS.6(3). THE MODIFICATIONS TO THE <br />MONR'ORING PLAN SHALL, AT A MINIMUM, ADDRESS COLLECITON OF ADEQUATE FLAW DATA, TOTAL DISSOLVED <br />SOLIDS AND SPECIFIC CONDUCTIVITY DATA FROM SURFACE AND ALLUVWL WELL SAMPLING LOCATIONS ALONG <br />TROUT' CRtex. <br />Origination: Permit Renewal No. 2. <br />Status: Resolved November 16, 1992. <br />Stipulation No. 33 <br />P&M MUST SUBMIT' A REVISED COPY OF EXHIBIT 4.6-6, NO LATER THAN DECEMBER S, 1993. THE RL1'ISED <br />EXHIBIT MAY NOT INCLUDE THE DISCLAIMER THAT PROHIBITS COPYING OF THE MAP AND~OR REQUIRES rIS <br />REIZIRN AT PBt M'S REQUEST'. <br />Origination: Technical Revision No. 25. <br />Status: Resolved November 8, 1993. <br />Edna Mine (G60.001) May IB, 1994 <br />Midtctm Rcvicw 7 Third Permit Tertn <br />