Laserfiche WebLink
,. <br />Section VI -Bonding Summary <br />The Division currently holds a total of $7,171,716.00 in corporate sureties for the reclamation <br />performance bond at the Edna Mine. The performance bond liability for the site has been <br />established at $7,171,716.00. The reclamation cost estimate should be recalculated to account for <br />permit revisions approved and increased disturbance since the permit was renewed. <br />FAna Mine (C-BQ-0OI) <br />Midterm Revicw <br />15 <br />May I8, 1994 <br />Thud Permit Term <br />