My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21131
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:21 PM
Creation date
11/21/2007 9:55:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Enforcement
Doc Date
6/10/1997
Doc Name
YOAST MINE C-94-082 NOV C-97-004
From
SENECA COAL CO
To
DMG
Violation No.
CV1997004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III 111111 III IIIIIIIIII III ~ ~ <br />E~~A <br />s Coal Company Seneca Coal Company <br />June 10, 1997 <br />Mr. Jim Burnell <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Yoast Mine Permit C-94-082, NOV C-97-004 <br />Dear Mr. Burriell: <br />This correspondence is a request for an extension of time for the <br />abatement of NOV C-97-004 to the Yoast Mine Permit C-94-082. The <br />current abatement deadline for this NOV is Tuesday, June 17th. <br />Step 1 of this NOV required Seneca to remove all sloughed fill <br />material from the channel of Annand Draw near culvert YB-6. As <br />you noticed during your inspection of the minesite on June 9th, <br />this work has been completed. The only step left is to install <br />the silt fence at the toe of each road slope as an additional <br />measure to prevent a reoccurrence. Step 2 of the abatement <br />required us to grade the fill material located adjacent to RCR 27 <br />to the final 5:1 slope proposed in TR-O5. We are unable to <br />initiate this portion of the abatement next to RCR 27 until after <br />the 10-day public comment period expires, since TR-05 was <br />approved by the Division on May 30th. Finally, step 3 of the NOV <br />was to complete the construction of the relief drains on Yoast <br />Haul Road A per the designs in the permit. The riprap for the <br />down drains has been ordered and we will start receiving it later <br />this week. Seneca will begin finishing the abatement projects for <br />this NOV as soon as the riprap arrives and the public comment <br />period ends. I am asking for a 30-day extension of the current <br />deadline to July 17th. <br />Should you or any other members of the Division have any <br />questions regarding this information, please do not hesitate to <br />contact me. <br />Sincerely, <br />~.~. <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />c: Gary Wendt (PWCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.