Laserfiche WebLink
r4 <br />- ~.t III IIIIIIIIIIIII III <br />Pond E Re-construction Permitti~ History <br />November 7, 1994 Division Adequacy Letter <br />Please provide the watershed map for the SEDCAD+ run provided for Pond E re- <br />construction. This map should include current topographic contours, all drainage <br />control structures which are involved clearly labeled (culverts, ditches, etc.), and have <br />the routing network clearly depicted. This should include all ditches, culverts, and <br />sediment control features associated with Ponds D and E. No review of this portion <br />of the revision will be conducted until this map is provided. <br />December 23, 1995 TCC response <br />This map has been forwarded by ACZ under separate cover. <br />•sas^•sss•esssessssses-ssssssssessas saa-sas ess sasses sass ^ssr sass <br />January 12, 1995 Division Adequacy Letter <br />Our understanding is that Pond E is being re-constructed in its proposed location <br />using the previous design. Please identify this design in TR-18 permit text, <br />referencing existing design plans including pond maps, cross-sections, riser details, <br />etc. As you are aware, this design must be done by a registered, professional <br />engineer and as-built certified by the same as well after construction. (Rule <br />4.05.6(10)) <br />March 2, 1995 TCC response <br />The original design for this pond is presented in permit C-81-071 and the appropriate <br />references have been included in the text of TR-18. The appropriate information is <br />incorporated by reference into TR-18. Also, the present design information has been <br />prepared by Terra Matrix and signed by a professional engineer. The Division is <br />aware of the original design and certifications for the pond. Also, the as-built for the <br />pond will be prepared by a professional engineer, but it may not be the same <br />engineer that designed the pond. <br />^•ssssssasasssasssesssessssesssessssesyesseassasessssesssesssesss• <br />March 9, 1995 Division Adequacy review letter <br />The Division will assume, as we discussed on March 7, 1995, that Pond E will be re- <br />constructed as presented on Plate 1, sheet 4 of 4, Sedimentation Ponds Energy Mines <br />