Laserfiche WebLink
TABLE OF CONTENTS (Con't) <br />• Page <br />XVIII. Coal Processing Waste and Non-Coal Processing <br />Waste - Rules 2.05.3(8), 2.05,4(2)(f), <br />4.10 and 4.11 65 <br />XIX. Mine Facilities, Roads, Ponds, Impoundments, <br />Diversions and Coal Handling Structures - Rules <br />2.05,3(3), 2.05.3(4), 2.05.3(7), 4.03, 4.04 <br />and 4.05. 65 <br />XX. Bonding - Rule 2.05.4(2)b and Rule 3 67 <br />XXI. Sealing of Drilled Holes and Underground <br />Openings - Rules 2,05.4(2)(9) and 4.07. . <br />XXII. Subsidence - Rules 2.05.6(6) and 4.20 68 <br />XXIII. Miscellaneous Compliance - Rule 2.05.6(5), <br />4.02,4.12, 4.19, 4,21 and 4.30 70 <br />XXIV, Operations on Land Subject Limitations or <br />Prohibitions - Rules 2.03.7 and 2.10. 70 <br />XXV. Demonstration that Surface Coal Mining and <br />. Reclamation Operations can be Feasibly <br />Accomplished - Rule 2.07.6(2)(b) 70 <br />XXVI. Compatibility with Existing Operations - Rule <br />2.07.6(2)(1) 71 <br />XXV II. Reclamation Fee Required by 30 CFR, Chapter VII, <br />Subchapter R - Rule 2.07.6(2)( ) 71 <br />• iii <br />