Laserfiche WebLink
TIMES FOR ABATEMENT <br />A. Unplug the d~watering pipe of Pond 22P17 and replace the cap on the outlet <br />by May 21, 1984 <br />B. Replace the PVC cap on the principle spillway of Pond 22P4 by May 21, 1984. <br />C. Locate the outlets of Pond 22P6 and remove material from around the outlet <br />by May 21, 1984. <br />D. Replace the cap and collar on the outlet of sediment Pond 22P5 by <br />May 21, 1984 <br />E. Repair the principle spillway of Pond 22P3 by May 28, 1984 . <br />F. Clean sediment from Pond 22P9 or move the sediment pond according to the <br />approved plan by June 18, 1984. <br />G. Increase the freeboard on Pond 22P11 to a minimum of one foot by <br />May 28, 1984. <br />H. Clean principle spillways on sediment Ponds 22P12 and 22P14 by <br />May 28, 1984. <br />I. Repair the embankment of sediment Pond 22P13 by May 21, 1984. <br />J. Revise the Pit 4 and 5 sediment control above diversion Ditches 1503 and <br />1504 by June 18, 1984. <br />K. Construct diversion Ditches 2204, 2205, and 2206 or revise the appropriate <br />sediment control plans by June 18, 1984. <br />L. Clean the east ditch leading to sediment Pond 22P12 and the ditch leading <br />to sediment Pond 22P19 by May 28, 1984. <br />M. Submit a plan to bring the principle spillways of the Pit 4 and 5 sediment <br />ponds plus Pond 22P17 into compliance with the retention time requirements of <br />Rule 4.05 by June 18, 1984 <br />