My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08460
DRMS
>
Back File Migration
>
Revision
>
REV08460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:04 AM
Creation date
11/21/2007 9:53:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/9/1991
Doc Name
MT GUNNISON 1 MINE PERMIT RENEWAL APPLICATION PRELIMINARY ADEQUACY REVIEW FN C-80-007
From
MLRD
To
WEST ELK COAL CO INC
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~. <br />.... <br />.~ <br />~1' <br />Mt. Gunnison Mine (Permit C-80-007) <br />Perms enewa re rminary equacy eview <br />April 9, 1991 <br />I. Company Management Information <br />1. As of April 1, 1991, the name of the mine, the managing company, <br />and the list of directors has changed. These changes should be <br />reflected in the permit renewal application. <br />II. Classification of Permitted Acreage <br />1. The permit renewal application lists acreages of disturbed areas, <br />of affected areas, and of permitted areas that do not coincide with <br />the permit document values listed on page 1-1 and page 1-155, Table <br />1.13.A. Please reconcile these differences. <br />III. Emissions Permits <br />1. The emissions permits, Nos.C-13-034 (1) through (7) in Volume 4 of <br />the permit, do not show final approval. However, final approval <br />was requested in the March 7, 1984 letter to the Air Pollution <br />Control Division included in Yolume 4. Please provide emissions <br />permits that have final approval. <br />IY. Future Increases in Coal Production <br />1. If the operator of the Mt. Gunnison Mine intends to increase coal <br />production, as was advertised in Coal Week February 25, 1991, then <br />appropriate updates in the permit ocumen will be necessary before <br />production increases. <br />V. Topsoil <br />1. Please update Exhibit 4.2.1 .A - Topsoil Removal Plan and Exhibit <br />4.2.1.6 Topsoil Replacement Plan to reflect current mine facility <br />configurations and topsoil removal and replacement plans for the <br />facilities area. <br />2. Please submit one map that has soil stockpile locations delineated, <br />their estimated volumes and where they will be used (Rules <br />2.05.3(5) and 2.05.4(2)(d)). <br />3. Please submit a sampling plan to determine compliance with topsoil <br />depth replacement requirements on the facilities areas and the <br />waste pile(s) (Rule 2.05.4 (2)(e)(vii)). <br />VI. Surface Hydrology <br />1. The operator should provide design details for all culverts at the <br />site. In particular, designs for the culverts located along the <br />Sylvester Gulch drainage must be submitted. Also, based on a map <br />entitled "Surface Site Drainage Control: General Locations", there <br />
The URL can be used to link to this page
Your browser does not support the video tag.