My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21010
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:17 PM
Creation date
11/21/2007 9:53:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Enforcement
Doc Date
4/16/1993
Doc Name
Certification of Pond E
From
KERR COAL CO
To
MLRD
Violation No.
CV1993029
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />kerr coal company <br />box 487 ~ Walden, Colorado 80480 ~ (303) 723-4721 <br />April 14, 1993 <br />iii-iiniiiiiiiiiii . <br />999 <br />~. <br />Y <br /> <br />Mr. Randall P. Price <br />Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: NOV C-93-029 Kerr Mine, Pond "E' <br />Dear Mr. Price: <br /> <br />J,v~s~nrl a n.",~~;s h ~aaayY <br />This is to certify, by my signature, that the above referenced Pond (Pond E) at the Kerr Coal Company <br />Marr Mine, did not discharge via the emergency spillway. Pond E was monitored on a daily basis <br />during the period from April 1st through 5th, 1993, by one or more of the following Kerr staff: <br />• T. Charles Fliniau <br />• James C. Mossman <br />• George V. Patterson <br />In a good faith effort, Kerr hired a local contractor, Glenn E. Sessions & Sons, Inc., Box 1076, Walden, <br />Colorado 80480, to thaw the ice in the discharge end of the Pond E conduit with their portable steamer <br />on April 5, 1993. The operators name was Warren Quick. He arrived at Pond E at 8:OOam and Pond <br />E was discharging through the discharge orifice at what appeared to be full design flow capacity at <br />8:30am, April 5, 1993. Pleaze see the attached Daily Time Report, dated April 5, 1993, by Warren <br />Quick. Remedial measures and resulting discharge were witnessed by the above named Kerr staff <br />personnel. <br />I trust that this satisfies the immediate abatement requirements as stated in NOV-93-029. In addition, <br />Kerr will monitor Pond E and other sedimentation ponds and take necessary steps to provide for <br />consistent operation of dewatering structures. <br />Sincerely, <br />c <br />.~ <br />~~~~f - - <br />~~ .- _ <br />eorge V. Patterson <br />Mine Manager <br />GVP:cmc <br />enclosure <br />cc: Rich A. Munson, (EFC) <br />Jerry M. Nettleton (ACZ) <br />C:\...KERR\a JO\GVP LTR <br />OV/14/9J IOam <br />
The URL can be used to link to this page
Your browser does not support the video tag.